Sfoglia per Autore
Gestione integrata di sistemi produttivi interagenti: metodi avanzati per la quick response
2001-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano; Lambiase, Alfredo
An architecture for production management in SMEs based on a dynamic link between project management and accounting packages
2001-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano
Gestione della Supply Chain mediante federazione di simulatori interagenti
2002-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano; Lambiase, Alfredo
Proposta d'integrazione tra simulazione e tecniche reticolari a supporto della programmazione operativa
2002-01-01 Miranda, Salvatore; Iannone, Raffaele; Riemma, Stefano
An architecture for synchronization of supply chain simulators distributed on network
2002-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano
An Hybrid multi agent approach for dynamic scheduling
2003-01-01 Iannone, Raffaele; Cristiano, Lovaglio; Riemma, Stefano
A Model for Iterative Optimisation of Supply Chain inventory and transport costs
2003-01-01 Fabrizio, Bartilomo; Iannone, Raffaele; Riemma, Stefano
A dinamic model for spare parts inventory management integrated with the CRP system
2003-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano
Additional Performances With Collaborative Agents In Dynamic Scheduling
2004-01-01 Iannone, Raffaele; Lovaglio, C; Riemma, Stefano
Proposta di un modello simulativo per la determinazione automatica delle pause di lavoro in attività manifatturiere a prevalente contenuto manuale
2004-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano
Analisi delle prestazioni di una supply network in presenza di schedulazione dinamica degli ordini
2004-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano
Simulation And Network Planning For Advanced Scheduling
2004-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano
Scheduling of waiting queues in manufacturing workprocess using a human reliability measure
2005-01-01 Iannone, Raffaele; Lovaglio, C; Riemma, Stefano
Performance Improvement of a Supply Network with on-line management of backward scheduling: a simulation study
2006-01-01 Iannone, Raffaele; Lambiase, Alfredo; Miranda, Salvatore; Riemma, Stefano
An integrated methodology for technical process reengineering in manufacturing plants
2006-01-01 DE FALCO, Massimo; Iannone, Raffaele; Miranda, Salvatore
The performance of mid-term planning activities: a methodological proposal
2007-01-01 Pepe, C; Iannone, Raffaele; Riemma, Stefano
Supply chain distributed simulation: an efficient architecture for multi-model synchronization
2007-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano
A proposal of a management framework to optimize waiting queue in healthcare organizations
2007-01-01 Iannone, Raffaele; C., Pepe; Riemma, Stefano
A heuristic procedure to determine the number of kanbans in an unstable multi stage productive system
2007-01-01 Iannone, Raffaele; Miranda, Salvatore; Riemma, Stefano
Development of a planning system to manage resources, facilities and materials in healthcare structures
2009-01-01 Iannone, Raffaele; C., Pepe; Riemma, Stefano
Legenda icone
- file ad accesso aperto
- file disponibili sulla rete interna
- file disponibili agli utenti autorizzati
- file disponibili solo agli amministratori
- file sotto embargo
- nessun file disponibile