This paper studies cable-stayed bridges (CSBs), with special focus on the initial force distribu-tions in cables during construction phases. A code for the computing of optimal pre-tensioning sequence of cables is presented. A procedure for the optimization of cable forces is developed, according to a given objective function. Particular attention is given to the choice of the parame-ters to be optimized, and numeric examples are provided. The proposed method is employed to study the At Tannumah bridge in Basrah, Iraq; and is suitable for the optimization of the pre-tensioning sequence of arbitrary cable-stayed bridges.

On the optimal design of the pre-tensioning of cable-stayed bridges

CARPENTIERI, GERARDO;FRATERNALI, Fernando
2015-01-01

Abstract

This paper studies cable-stayed bridges (CSBs), with special focus on the initial force distribu-tions in cables during construction phases. A code for the computing of optimal pre-tensioning sequence of cables is presented. A procedure for the optimization of cable forces is developed, according to a given objective function. Particular attention is given to the choice of the parame-ters to be optimized, and numeric examples are provided. The proposed method is employed to study the At Tannumah bridge in Basrah, Iraq; and is suitable for the optimization of the pre-tensioning sequence of arbitrary cable-stayed bridges.
2015
978-88-940089-4-4
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11386/4649719
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact