The theme of the recovery of historical buildings is current, especially in a period in which, for known economic, financial, social and political reasons, interventions of new constructions and investment have declined dramatically and investments, although contained, are diverted to energy rehabilitation and functional recovery and restoration of existing buildings. Our country has a housing stock that, if properly managed and developed, can turn into an asset by potential priceless. Often, however, customers, designers and contractors are not ready for action in addressing the demanding projects on historical buildings, losing opportunities for development and economic growth. Just think, for example, to the considerable funds that the EU allocates periodically to facilitate the recovery of historic buildings and that often our country is not able to find or spend. The most common causes of these inefficiencies are attributable to the reluctance - in the fields of engineering and architecture - to the planning, management of enterprise-resource, teamwork, updated, the industrialization of construction site, quality control and so on. This PhD research is aimed to study, from the theoretical point of view and from the study of the state of the art, the efficiency - in terms of productivity and quality of work - of a new approach for analysis, management and control of the building process, through the use of the methodology of building information modeling using two case studies of reference: the assessment of the applicability of the BIM Surveying to the historical buildings and the possible benefits of the latter compared to the use of traditional survey methods. Building information modeling, already widely used successfully in other countries as part of interventions of new construction, it is a 'way of working' relatively young and little known in many advanced counties, including Italy. It is configured as a holistic and coordinated method to assist architects, engineers, customers, decision makers, maintenance staff and all those involved in the building project. In the current traditional practice, the life cycle of a building - from design, to construction management, from supply management to the maintenance work in the year - remains fragmented and based on a continuous and not-organized exchange of information between the various actors involved in the construction process. Errors, omissions or inaccuracies contained in these documents (paper or digital) are often due to unexpected costs, delays in the design and execution of the work, of legal actions between clients and companies or designers... [edited by Author]

Un nuovo approccio di analisi, gestione e controllo del processo edilizio sul patrimonio storico / Saverio D'auria , 2015 Apr 23., Anno Accademico 2012 - 2013.

Un nuovo approccio di analisi, gestione e controllo del processo edilizio sul patrimonio storico

D'Auria, Saverio
2015

Abstract

The theme of the recovery of historical buildings is current, especially in a period in which, for known economic, financial, social and political reasons, interventions of new constructions and investment have declined dramatically and investments, although contained, are diverted to energy rehabilitation and functional recovery and restoration of existing buildings. Our country has a housing stock that, if properly managed and developed, can turn into an asset by potential priceless. Often, however, customers, designers and contractors are not ready for action in addressing the demanding projects on historical buildings, losing opportunities for development and economic growth. Just think, for example, to the considerable funds that the EU allocates periodically to facilitate the recovery of historic buildings and that often our country is not able to find or spend. The most common causes of these inefficiencies are attributable to the reluctance - in the fields of engineering and architecture - to the planning, management of enterprise-resource, teamwork, updated, the industrialization of construction site, quality control and so on. This PhD research is aimed to study, from the theoretical point of view and from the study of the state of the art, the efficiency - in terms of productivity and quality of work - of a new approach for analysis, management and control of the building process, through the use of the methodology of building information modeling using two case studies of reference: the assessment of the applicability of the BIM Surveying to the historical buildings and the possible benefits of the latter compared to the use of traditional survey methods. Building information modeling, already widely used successfully in other countries as part of interventions of new construction, it is a 'way of working' relatively young and little known in many advanced counties, including Italy. It is configured as a holistic and coordinated method to assist architects, engineers, customers, decision makers, maintenance staff and all those involved in the building project. In the current traditional practice, the life cycle of a building - from design, to construction management, from supply management to the maintenance work in the year - remains fragmented and based on a continuous and not-organized exchange of information between the various actors involved in the construction process. Errors, omissions or inaccuracies contained in these documents (paper or digital) are often due to unexpected costs, delays in the design and execution of the work, of legal actions between clients and companies or designers... [edited by Author]
23-apr-2015
Ingegneria delle strutture e del recupero edilizio e urbano
Building Information Modeling
building heritage
laser scanning
Sicignano, Enrico
Faella, Ciro
File in questo prodotto:
File Dimensione Formato  
140484698792607885745076182996445007092.pdf

accesso aperto

Tipologia: Altro materiale allegato
Dimensione 75.77 kB
Formato Adobe PDF
75.77 kB Adobe PDF Visualizza/Apri
82655775736483857345597279491960384367.pdf

accesso aperto

Tipologia: Altro materiale allegato
Dimensione 11.57 MB
Formato Adobe PDF
11.57 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11386/4924631
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact