The Additive Manufacturing (AM) scheduling problem is becoming a very felt issue not only by the scholars but also by the practitioners who are looking to this new technology as a new integrated part of their traditional production systems. They need new scheduling models to adapt the traditional scheduling rules to the changed ones of the additive manufacturing. This paper deals with the enhancement of a scheduling problem for additive manufacturing just present in literature and the presentation of a new meta-heursitic (adapted to the new requirements of the additive manufacturing technology) based on the tabu-search algorithms.
A modified tabu search algorithm for the single-machine scheduling problem using additive manufacturing technology
Lambiase A.
2020-01-01
Abstract
The Additive Manufacturing (AM) scheduling problem is becoming a very felt issue not only by the scholars but also by the practitioners who are looking to this new technology as a new integrated part of their traditional production systems. They need new scheduling models to adapt the traditional scheduling rules to the changed ones of the additive manufacturing. This paper deals with the enhancement of a scheduling problem for additive manufacturing just present in literature and the presentation of a new meta-heursitic (adapted to the new requirements of the additive manufacturing technology) based on the tabu-search algorithms.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.