The issue of environmental sustainability is increasingly topical, and one of the most impactful sectors is the construction industry. As stated in the GlobalABC reports, the building sector is the main sector responsible for GHG emissions, generating about 37% of global CO2e emissions. Already during the phases of production and construction of buildings, about 10% of global emissions are produced, while the remaining part comes from using energy for air conditioning and lighting. Reducing emissions in buildings’ pre-use phase is a crucial issue for fighting climate investigates the potential of timber construction systems due to the carbon storage property of the material. The proposed calculation methodology is structured according to the Life Cycle Assessment (LCA) approach, referring to the C2H phase (from Cradle-to-Handover), and evaluates emissions related to buildings production and construction. In order to identify the timber construction system that minimizes CO2e emissions, the method was applied within the limits of the investigation (A1–A5 phases) to two buildings built with different technologies: an X-Lam panel and a framed structured building. The results were analyzed, compared, and discussed to demonstrate that timber buildings will be the most virtuous solution in the Net Zero Carbon perspective by 2050
Life Cycle Assessment from Cradle-to-Handover Approach to Greenhouse Gas Emissions Mitigation: Carbon Storage in Timber Buildings
Di Ruocco, Giacomo
;Gaita, Angela
2023-01-01
Abstract
The issue of environmental sustainability is increasingly topical, and one of the most impactful sectors is the construction industry. As stated in the GlobalABC reports, the building sector is the main sector responsible for GHG emissions, generating about 37% of global CO2e emissions. Already during the phases of production and construction of buildings, about 10% of global emissions are produced, while the remaining part comes from using energy for air conditioning and lighting. Reducing emissions in buildings’ pre-use phase is a crucial issue for fighting climate investigates the potential of timber construction systems due to the carbon storage property of the material. The proposed calculation methodology is structured according to the Life Cycle Assessment (LCA) approach, referring to the C2H phase (from Cradle-to-Handover), and evaluates emissions related to buildings production and construction. In order to identify the timber construction system that minimizes CO2e emissions, the method was applied within the limits of the investigation (A1–A5 phases) to two buildings built with different technologies: an X-Lam panel and a framed structured building. The results were analyzed, compared, and discussed to demonstrate that timber buildings will be the most virtuous solution in the Net Zero Carbon perspective by 2050I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.