Nowadays, taking into account the intermittency of renewable energy resources such as wind farms and uncertainty of load demand seems helpful to obtain a more reliable strategy for the power systems. Nevertheless, information gap decision theory (IGDT) as a nonprobabilistic method has been employed in numerous papers to address the uncertain behavior of input parameters, the simultaneous optimal values of main objective functions (OF) such as cost and radius of uncertainty cannot be guaranteed. To overcome this issue, Fuzzy- IGDT is used, on the other hand, this approach reports the same value for the radius of uncertainty related to the uncertain resources. To cope with this problem, this article presents an algorithm considering uncertainties of multiple wind farms and load demand by acquiring different uncertain bands based on the decision-maker's preferences. Moreover, it is appropriate for uncertain resources with direct and inverse effects on the OF. In other words, it is more flexible than fuzzy-information gap decision theory. The precision of the proposed framework is evaluated by Monte Carlo simulation, meanwhile, its effectiveness and performances are proved. To guarantee global optimal results with reliable precision, the linearized approximation of the original mix integer nonlinear programming model has been accomplished in the GAMS platform. The performance of presented method is illustrated by utilizing IEEE 30 BUS and IEEE 62 bus systems.

A Flexible Risk-Averse Strategy Considering Uncertainties of Demand and Multiple Wind Farms in Electrical Grids

Siano P.
2022-01-01

Abstract

Nowadays, taking into account the intermittency of renewable energy resources such as wind farms and uncertainty of load demand seems helpful to obtain a more reliable strategy for the power systems. Nevertheless, information gap decision theory (IGDT) as a nonprobabilistic method has been employed in numerous papers to address the uncertain behavior of input parameters, the simultaneous optimal values of main objective functions (OF) such as cost and radius of uncertainty cannot be guaranteed. To overcome this issue, Fuzzy- IGDT is used, on the other hand, this approach reports the same value for the radius of uncertainty related to the uncertain resources. To cope with this problem, this article presents an algorithm considering uncertainties of multiple wind farms and load demand by acquiring different uncertain bands based on the decision-maker's preferences. Moreover, it is appropriate for uncertain resources with direct and inverse effects on the OF. In other words, it is more flexible than fuzzy-information gap decision theory. The precision of the proposed framework is evaluated by Monte Carlo simulation, meanwhile, its effectiveness and performances are proved. To guarantee global optimal results with reliable precision, the linearized approximation of the original mix integer nonlinear programming model has been accomplished in the GAMS platform. The performance of presented method is illustrated by utilizing IEEE 30 BUS and IEEE 62 bus systems.
2022
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11386/4804937
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 11
  • ???jsp.display-item.citation.isi??? 9
social impact